Tavengwa Norman and Brian Mupini (2026) “Risk-integrated contractor allocation in Zimbabwe’s timber value chain”, Computer Science and Information Technologies, 7(3), pp. 337–345. doi: 10.11591/csit.v7i3.p337-345.