Tavengwa Norman, and Brian Mupini. 2026. “Risk-Integrated Contractor Allocation in Zimbabwe’s Timber Value Chain”. Computer Science and Information Technologies 7 (3):337-45. https://doi.org/10.11591/csit.v7i3.p337-345.